Use Case

Infrastructure Migration

Plan and execute network migrations with confidence.

Pre-Migration

Move with complete visibility.

Document everything first
Every device, rack position, cable connection, IP assignment, and site detail captured up front.
Built on authoritative data
Your runbook comes from a structured, queryable database, not spreadsheets forwarded between teams.
Kill the biggest risk
Knowing exactly what you have and where it lives eliminates the top source of migration failure.
Inventory Summary

214

Devices

18

Racks

3,042

IP addresses

1,208

Cables

98% documented · ready to move
Topology

See what must move together.

Visual dependency map
Devices, racks, subnets, VMs, and circuits rendered as one interactive graph per site.
Connectivity chains
Identify the devices that must move together and the cables that tie them to their location.
No doc archaeology
The full picture in one view instead of digging through disconnected documents.
Topology · Singapore DC
Switch-CORE1Server-PP4Server-SRV3-2Server-SRV3-310.0.1.0/24
Active device Subnet Cable IP assignment
Post-Cutover

Verify the move, field by field.

Complete move record
The changelog captures every device moved, IP reassigned, and cable reterminated.
Baseline comparison
Compare documented post-migration state against the pre-migration baseline.
Catch discrepancies early
Surface mismatches before they cause outages, and keep the record for post-project review.
j

john modified R04

Change #4831 · 6/25/2026, 7:30:39 PM

Updated
FIELD CHANGES
status
activeretired
siteSingapore DC (unchanged)
notes Moved to storage row
Comparison

How it compares

Everyone documents a data center somehow. Here is where Obelinf sits.

OptionPre-move inventoryDependency mappingPost-move verificationSetup timeCost
SpreadsheetsPartialNoManualInstant, then staleFree (your time)
NetBoxYesPluginPartialHours to daysFree, self-hosted
ObelinfOur pick
CompleteAutomaticChangelog comparisonMinutesFree to $299/mo

Ready to migrate with confidence?